On November 14 the company ACV organized a seminar on the calculation and design of sanitary hot water facilities. He made an introduction to the new manufacturing requirements applicable to boilers and the Spanish regulations RITE and CTE were reviewed. There was also talk about the different installation systems for the production of hot water and the criteria for the reduction of energy losses in the facilities.
The day, which lasted two hours, ended with an example of the ACV Archimedes online calculation program.